Aurelia Skipwith from the U.S. Department of the Interior and Brooke Wahlberg discuss scheduling a meeting to check in on the Skookumchuck project, with proposed times on May 8 and May 10, 2019.
|
2019 |
— |
—
|
2 |
|
The email from Brooke Wahlberg to Aurelia Skipwith discusses a check-in regarding the Skookumchuck, indicating a need for clarity on next steps and potential in-person meetings at the Department of the Interior (DOI).
|
2019 |
— |
—
|
1 |
|
The email exchange between Aurelia Skipwith of the U.S. Department of the Interior and Alex King discusses scheduling a meeting regarding wind energy, with proposed times for the meeting in early May 2019.
|
2019 |
— |
—
|
4 |
|
The email from Allison Nyholm at an unspecified agency discusses the rescheduling of a wind energy meeting focused on wildlife and eagle permitting, involving key participants from the American Wind Energy Association (AWEA) and the need for broader coalition building.
|
2019 |
— |
—
|
2 |
|
The email from Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, discusses scheduling a meeting to address the Energy and Wildlife Action Coalition's perspectives on the Endangered Species Act habitat definition in light of the Weyerhaeuser Supreme Court decision.
|
2019 |
— |
—
|
2 |
|
The email correspondence between Allison Nyholm and Aurelia Skipwith discusses scheduling a meeting to address concerns regarding permitting processes related to wildlife, specifically focusing on bald and golden eagles, within the U.S. Department of the Interior.
|
2019 |
— |
—
|
3 |
|
The email from Allison Nyholm of Steptoe & Johnson LLP to Aurelia Skipwith discusses the need for a conversation about permitting related to a client in the wind energy sector and mentions specific individuals at the Fish and Wildlife Service to consult regarding these issues.
|
2019 |
— |
—
|
2 |
|
Aurelia Skipwith from the U.S. Department of the Interior scheduled a meeting with Placer County officials on May 3 to discuss their Habitat Conservation Plan and related documents submitted to the U.S. Fish & Wildlife Service.
|
2019 |
— |
—
|
2 |
|
The email from Ana Kennedy Otto to Director James Mago requests the USDA Farm Service Agency's support to initiate a Section 7 conference with the US Fish and Wildlife Service regarding the monarch butterfly, as requested by the Arizona Farm Bureau.
|
2019 |
— |
—
|
1 |
|
The email from Jordan Dux to Nancy Johner of the USDA FSA discusses a letter from NEFB President Steve Nelson requesting support for a Section 7 Conference between USDA and the U.S. Fish and Wildlife Service regarding the monarch butterfly.
|
2019 |
— |
—
|
2 |
|
Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, informs John Anderson that she needs to reschedule a meeting regarding NPS lands' right-of-way access issues due to international travel.
|
2019 |
— |
—
|
4 |
|
The email from Perkins Coie invites Aurelia Skipwith of the Department of the Interior to a reception for the Board of Directors of the Western Urban Water Coalition in Washington D.C. on April 11, 2019, to discuss urban water issues affecting major metropolitan areas in the western United States.
|
2019 |
— |
—
|
2 |
|
The email from Laura Skaer of the American Exploration & Mining Association discusses recent sage-grouse science and critiques the adequacy of a new USGS study, suggesting it lacks the best available science and referencing ignored studies.
|
2019 |
— |
—
|
1 |
|
The email from Pamela Scruggs of the U.S. Fish and Wildlife Service informs Laura VanderMeer that Acting Assistant Director Eric Alvarez will attend a meeting with Alliance members, and addresses a spelling correction for Aurelia Skipwith's name on the presentation.
|
2019 |
— |
—
|
5 |
|
The email from Laura VanderMeer of Kelley Drye & Warren LLP discusses the final plan for a panel involving the U.S. Fish and Wildlife Service (FWS) and other regulators, highlighting a change in the agenda and a spelling correction for Aurelia Skipwith's name.
|
2019 |
— |
—
|
3 |
|
Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, is coordinating with Laura VanderMeer regarding an upcoming meeting and the necessary departmental ethics review.
|
2019 |
— |
—
|
8 |
|
The email from John Anderson to Aurelia Skipwith discusses scheduling a meeting for April 10th with the Western Utilities Group.
|
2019 |
— |
—
|
1 |
|
The email correspondence involves the U.S. Department of the Interior's Fish and Wildlife Service, discussing logistics and coordination for an upcoming meeting on U.S. priorities for CITES, with Aurelia Skipwith stepping in for Andrea Travnicek.
|
2019 |
— |
—
|
3 |
|
The U.S. Department of the Interior's Deputy Assistant Secretary Aurelia Skipwith confirmed a meeting with Ron McMurray and representatives from AEMA for February 7, 2019, at 9:00 AM.
|
2019 |
— |
—
|
4 |
|
Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, confirmed a meeting on February 7th at 9am with Ron McMurray regarding a discussion with Laura Skaer and Mark Compton of AEMA.
|
2019 |
— |
—
|
4 |
|
The email from Brooke Wahlberg to Aurelia Skipwith discusses the need for a call regarding the Skookumchuck project following the closure of the EIS comment period and inquires about USFWS personnel handling section 7 consultations on critical timelines.
|
2019 |
— |
—
|
1 |
|
The document is a Google Calendar invitation for a meeting regarding the Blue Creek Habitat Conservation Plan (HCP) scheduled for January 31, 2019, with attendees including Brooke M. Wahlberg and Aurelia Skipwith from the Department of the Interior.
|
2019 |
— |
—
|
1 |
|
The email exchange between Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, and Brooke Wahlberg discusses scheduling a phone call to discuss project updates amid the government shutdown, with Skipwith indicating a limited scope for projects at that time.
|
2019 |
— |
—
|
2 |
|
Aurelia Skipwith, Deputy Assistant Secretary for Fish and Wildlife and Parks at the U.S. Department of the Interior, confirms a phone call with Brooke Wahlberg for January 31, 2019, to discuss background information on a project, while noting limitations due to the government shutdown.
|
2019 |
— |
—
|
3 |
|
The email correspondence between Ron McMurray and Aurelia Skipwith discusses scheduling a meeting with Laura Skaer and Mark Compton of AEMA, contingent on the end of the government shutdown, with proposed times from February 4 to February 7, 2019, involving the U.S. Department of the Interior.
|
2019 |
— |
—
|
3 |
|
The email from Tracie Lassiter of the U.S. Department of the Interior discusses coordinating a meeting between Mr. Mason and Mr. Balash, as requested by Mr. Mason, with details to follow.
|
2019 |
— |
—
|
2 |
|
David Houseknecht from the U.S. Geological Survey reported completing two phone interviews regarding the implications of recently signed ANWR legislation, discussing topics such as 3D seismic surveys and exploration interests in the ANWR coastal plain.
|
2018 |
— |
—
|
2 |
|
The memorandum from the Bureau of Safety and Environmental Enforcement of the United States Department of the Interior outlines the agency's response to Secretary's Order 3349, intended for internal review and deliberation.
|
2018 |
OS201700602 |
—
|
17 |
|
The U.S. Geological Survey's Aimee Devaris is coordinating with colleagues to compile a list of action items related to ecological studies requested by Deputy Secretary Travnicek, aiming to gather necessary budget information by the end of the day.
|
2018 |
— |
—
|
29 |
|
The email from Walter Guidroz of the U.S. Geological Survey discusses modifications to ongoing work related to the Environmental Restoration Program (ERP) in the Section 1002 area, including updates to data collection and participation in workshops.
|
2018 |
— |
—
|
20 |
|
The U.S. Geological Survey officials David Houseknecht and Walter Guidroz discuss a draft document regarding the Department of the Interior's potential plans to expedite an oil and gas lease sale in the Arctic National Wildlife Refuge (ANWR) within three years, following comments from Senator Murkowski.
|
2018 |
— |
—
|
4 |
|
The email discusses the summary of a bi-weekly operations meeting of the U.S. Geological Survey (USGS) with the Deputy Secretary, focusing on agenda items and project status related to Alaska and DOI priorities for FY18-19.
|
2018 |
— |
—
|
26 |
|
The U.S. Geological Survey is organizing a meeting on March 19, 2018, at 2:00 PM to discuss the next steps for 2D seismic data, as requested by Tim Petty, with key participants including Judy Nowakowski and David Houseknecht.
|
2018 |
— |
—
|
10 |
|
The U.S. Geological Survey staff, including David Houseknecht and David Applegate, are discussing revisions to a draft document for the Deputy Secretary, incorporating changes and additional questions based on prior discussions.
|
2018 |
— |
—
|
11 |
|
The U.S. Geological Survey (USGS) is preparing a document addressing questions raised during a meeting with Deputy Secretary Bernhardt, incorporating input from team members to ensure all key elements are covered.
|
2018 |
— |
—
|
3 |
|
The U.S. Geological Survey is coordinating briefings and meetings for Deputy Secretary Bernhardt's upcoming visit to Alaska, scheduled for the week of March 5, 2018, along with a visit from Susan Combs related to departmental reorganization.
|
2018 |
— |
—
|
4 |
|
The document summarizes a bi-weekly operations meeting of the U.S. Geological Survey (USGS) with Deputy Secretary Bernhardt, discussing critical minerals, infrastructure package advocacy, and USGS's role in supporting Department of the Interior (DOI) priorities in Alaska.
|
2018 |
— |
—
|
10 |
|
The USGS coordinated with the Fish and Wildlife Service to respond to a request regarding polar bear den habitat in the Arctic National Wildlife Refuge's 10-02 area, referencing a 2006 publication and providing relevant maps and data.
|
2018 |
— |
—
|
52 |
|
The National Park Service is coordinating with The Boring Company to finalize a draft easement and legal description for the BW tunnel project, addressing specific items from previous correspondence and seeking to expedite the process despite challenges with title companies.
|
2018 |
— |
—
|
4 |
|
The email from Edward McDonnell to Daniel Jorjani discusses a hypothetical scenario related to ethics within the U.S. Department of the Interior, emphasizing the importance of good faith reliance on agency ethics advice.
|
2018 |
— |
—
|
5 |
|
The email correspondence between Daniel Jorjani of the U.S. Department of the Interior and J. Steven Gardner discusses the status of Gardner's nomination as Director of the Office of Surface Mining Reclamation and Enforcement (OSMRE) and the upcoming meeting regarding ethics compliance.
|
2018 |
— |
—
|
10 |
|
The document details communications between J. Steven Gardner and the Department of the Interior regarding his ethics agreement and concerns raised by the Office of Government Ethics (OGE) about his potential conflicts of interest related to his appointment as Director of the Office of Surface Mining Reclamation and Enforcement (OSMRE).
|
2018 |
— |
—
|
9 |
|
The email correspondence between Steve Gardner and Kimberly Hintz discusses concerns raised by the Office of Government Ethics (OGE) regarding Gardner's passive investment in ECSI and the potential need for him to divest due to legal implications under 18 USC 203 and 5 USC app 502.
|
2018 |
— |
—
|
2 |
|
The email correspondence between Daniel Jorjani of the U.S. Department of the Interior and J. Steven Gardner discusses preparations for a business transition related to Gardner's potential confirmation as Director of the Office of Surface Mining Reclamation and Enforcement (OSMRE).
|
2018 |
— |
—
|
8 |
|
The email from J. Steven Gardner to Daniel Jorjani discusses the ongoing confirmation process and questions regarding Gardner's ethics agreement related to his position at the Department of the Interior, specifically addressing inquiries from the Office of Government Ethics about his business interests and potential conflicts of interest.
|
2018 |
— |
—
|
7 |
|
The email correspondence between Denny Rehberg and Gareth Rees of the Department of the Interior discusses scheduling a meeting regarding Castle Mountain Ventures' California mine, which is subject to ethics clearance.
|
2018 |
— |
—
|
4 |
|
The email correspondence between Denny Rehberg and Gareth Rees from the Department of the Interior discusses scheduling a meeting regarding Castle Mountain Venture, with a preference for May 14th at 1:00 PM.
|
2018 |
— |
—
|
8 |
|
The email correspondence between Chase Adams of the American Sheep Industry Association and Gareth Rees from the Department of the Interior discusses scheduling a meeting with Deputy Secretary Bernhardt to address the reevaluation of BLM policy 1730 regarding domestic sheep and goats.
|
2018 |
— |
—
|
3 |
|
The email exchange between Denny Rehberg and Gareth Rees of the Department of the Interior discusses scheduling a meeting regarding issues related to monuments and mines, while clarifying that discussions about Westlands Water District are not permitted due to ethical considerations.
|
2018 |
— |
—
|
5 |
|
The email correspondence between Gareth Rees from the Department of the Interior and Colin Hayes discusses scheduling a meeting regarding wind energy initiatives and the approval process for the meeting request.
|
2018 |
— |
—
|
4 |
|
The email correspondence between Gareth Rees of the Department of the Interior and Colin Hayes discusses scheduling a meeting regarding wind energy for September 14, 2018, at 11 AM.
|
2018 |
— |
—
|
8 |
|
The email exchange between Gareth Rees of the Department of the Interior and Colin Hayes discusses scheduling a meeting regarding wind energy, confirming a time on September 14th at 11 AM.
|
2018 |
— |
—
|
8 |
|
The Department of the Interior's Office of the Assistant Secretary for Land and Minerals Management is coordinating a meeting with the American Sheep Industry Association for January 2, 2019, following the Deputy Secretary's unavailability.
|
2018 |
— |
—
|
8 |
|
The Department of the Interior's Office of the Assistant Secretary for Land and Minerals Management is coordinating a meeting for the American Sheep Industry Association with Deputy Secretary Bernhardt, who is currently unavailable, and has tasked Tracie Lassiter with scheduling it for early January.
|
2018 |
— |
—
|
5 |
|
The National Park Service is coordinating a kickoff meeting with The Boring Company to discuss project details and scheduling, as communicated in a series of emails among agency officials and company representatives.
|
2018 |
— |
—
|
2 |
|
The email correspondence between Daniel Jorjani and Steve Gardner discusses the review of ethics issues related to the U.S. Department of the Interior.
|
2018 |
— |
—
|
1 |
|
The email correspondence involves the Department of the Interior discussing scheduling a meeting regarding the BW tunnel project with representatives from the Boring Company and the National Park Service.
|
2018 |
— |
—
|
7 |
|
The National Park Service (NPS) expressed concerns about the color of structures at the SpaceX Texas Launch Site, suggesting a shift to earth tones to reduce environmental contrast.
|
2018 |
— |
—
|
2 |
|
The email from the U.S. Department of the Interior discusses scheduling a meeting and coordinating document preparation related to a project, with specific tasks assigned to team members regarding scope and construction plans.
|
2018 |
— |
—
|
1 |
|
The email exchange involves the National Park Service coordinating a meeting and information sharing regarding a project with representatives from The Boring Company, specifically discussing scheduling, documentation, and concerns related to legal descriptions.
|
2018 |
— |
—
|
2 |
|
The Bureau of Land Management is coordinating with Yukon government officials regarding the Environmental Impact Statement (EIS) process for potential lease opportunities in the 1002 area, with inquiries about participation and resources for the scoping and commenting period.
|
2018 |
BLMAK201800695 |
—
|
4 |
|
The Bureau of Land Management is coordinating the creation of a Drupal page for the Coastal Plain project in preparation for a forthcoming Notice of Intent (NOI) and associated news release.
|
2018 |
BLMAK201800695 |
—
|
5 |
|
The email from Dr. Wendy M. Loya of the US Fish and Wildlife Service discusses the outline of the 1002 area of the Arctic National Wildlife Refuge and includes a map for reference, in response to a request from Paul at the National Snow & Ice Data Center regarding Arctic Alaska snow information.
|
2018 |
BLMAK201800695 |
—
|
18 |
|
The National Park Service is exploring alternative methods for initial land valuation related to a project involving The Boring Company, as a full appraisal may be challenging at this stage, while also emphasizing that completing the appraisal is not critical for starting construction.
|
2018 |
— |
—
|
2 |
|
The email from Steve Davis discusses the progress of the DC permitting process for Elon Musk's Hyperloop project, highlighting positive developments in the Environmental Assessment and suggesting an informal appraisal to expedite the process while the formal appraisal continues.
|
2018 |
— |
—
|
1 |
|
The Department of the Interior is coordinating engagement with Alaska Native stakeholder groups regarding the 10-02 lease sale by setting up a shared calendar for scheduled communications and meetings.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The U.S. Fish and Wildlife Service (FWS) Arctic Landscape Conservation Cooperative (LCC) is collaborating with researchers to conduct a snow depth study in the Arctic National Wildlife Refuge's 1002 area, utilizing LiDAR and remote sensing data to inform polar bear habitat modeling and vegetation protection during exploration activities.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The email from Dr. Wendy M. Loya of the US Fish and Wildlife Service discusses the subsistence relationship of six communities near the Arctic Refuge, highlighting their usage of the Refuge's resources as outlined in the Comprehensive Conservation Plan (CCP).
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The email correspondence between Nicole Hayes from the Bureau of Land Management and Wendy Loya from the U.S. Fish and Wildlife Service discusses the source and accuracy of a map related to caribou range data in the Arctic Refuge, with a request for recent data on the Porcupine and Central Herds.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The email exchange involves the National Park Service discussing the appraisal status and legal description concerns related to a project, with Peter May indicating he is reviewing comments and will provide further information.
|
2018 |
— |
—
|
1 |
|
The email correspondence involves the National Park Service (NPS) discussing a meeting and the provision of a standard Statement of Work (SOW) for an Environmental Assessment (EA) with representatives from the Boring Company and the Department of the Interior (DOI).
|
2018 |
— |
—
|
15 |
|
The National Park Service is coordinating with The Boring Company regarding a proposed ventilation shaft on private land, with discussions about a meeting and legal descriptions of the project.
|
2018 |
— |
—
|
2 |
|
The National Park Service is coordinating with The Boring Company regarding the development of ventilation shafts on private land, with plans for a kickoff meeting and further documentation to follow.
|
2018 |
— |
—
|
2 |
|
The document discusses the evolving list of information needs for the Arctic Refuge Coastal Plain 1002 area, coordinated by the U.S. Fish and Wildlife Service (FWS), in preparation for a meeting hosted by the Bureau of Land Management (BLM).
|
2018 |
BLMAK201800695 |
—
|
4 |
|
The Bureau of Land Management is coordinating the creation of a Drupal page and ePlanning site for the Coastal Plain project in preparation for a news release related to the National Environmental Policy Act (NEPA) process.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Bureau of Land Management is coordinating with the Department of the Interior to engage Alaska Native stakeholders regarding the upcoming 10-02 lease sale, emphasizing the importance of organized communication and scheduling to avoid miscommunication.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Department of the Interior is coordinating engagement with Alaska Native stakeholder groups regarding the 10-02 lease sale by establishing a shared calendar for scheduled communications and meetings.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Bureau of Land Management is coordinating the development of a Drupal page for the Coastal Plan, with a focus on gathering necessary information and images before a news release related to the project.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Bureau of Land Management (BLM) discusses Senator Dan Sullivan's comments on the potential for expedited oil and gas lease sales in the Arctic National Wildlife Refuge, highlighting concerns from environmental groups about bypassing necessary reviews and community consultations.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Bureau of Land Management (BLM) discusses the progress and clarity of plans for drilling in the Arctic National Wildlife Refuge (ANWR) in a communication from Acting Deputy State Director Serena Sweet.
|
2018 |
BLMAK201800695 |
—
|
2 |
|
The Bureau of Land Management is coordinating engagement with Alaska Native tribes and corporations regarding the upcoming 10-02 lease sale, with plans to establish a shared calendar for scheduled communications and meetings.
|
2018 |
BLMAK201800695 |
—
|
4 |
|
The email correspondence between Peter May of the National Park Service and Steve Davis of the Boring Company discusses scheduling a meeting to address project scope, construction plans, and legal concerns related to a project involving the National Park Service.
|
2018 |
— |
—
|
1 |
|
The email correspondence involves the National Park Service (NPS) coordinating a meeting with The Boring Company regarding project planning and legal concerns, with specific actions outlined for document provision and scheduling.
|
2018 |
— |
—
|
1 |
|
The email correspondence between National Park Service officials discusses the need for revisions to the legal description and mapping of a project, highlighting shortcomings identified by DOI reviewers that must be addressed before proceeding with an appraisal.
|
2018 |
— |
—
|
3 |
|
The National Park Service (NPS) is discussing the color of structures at the SpaceX Texas Launch Site, suggesting a shift to earth tones to reduce visual contrast with the environment.
|
2018 |
— |
—
|
2 |
|
The National Park Service is discussing concerns regarding the legal description related to The Boring Company's proposal for the Baltimore-Washington Parkway corridor and is seeking clarification from the company's team.
|
2018 |
— |
—
|
1 |
|
The email from Jane at The Boring Company invites Daniel Jorjani from the Department of the Interior, along with other officials, to discuss an Environmental Assessment (EA) on January 23, 2018.
|
2018 |
— |
—
|
2 |
|
The National Park Service responded to The Boring Company's proposal regarding the Baltimore-Washington Parkway corridor, providing relevant information and contact details for further discussion.
|
2018 |
— |
—
|
1 |
|
The email correspondence involves officials from the U.S. Department of the Interior discussing scheduling a meeting regarding the BW tunnel project for January 23, 2018.
|
2018 |
— |
—
|
8 |
|
The Institute of Clean Air Companies expressed gratitude to EPA Administrator Scott Pruitt for a productive meeting and committed to providing additional information on key issues discussed, including advancements in air quality measurement and support for American pollution control exports.
|
2018 |
HQ2017008402716 |
—
|
3 |
|
The National Park Service is coordinating with The Boring Company regarding the environmental assessment (EA) for the BW tunnel project, with a scheduled call to discuss further details.
|
2018 |
— |
—
|
6 |
|
The email from Jane at the Boring Company invites officials from the National Park Service and the Department of the Interior to discuss an Environmental Assessment on January 23, 2018.
|
2018 |
— |
—
|
2 |
|
The Boring Company is organizing a meeting with representatives from the National Park Service and the Department of the Interior to discuss an Environmental Assessment on January 23, 2018.
|
2018 |
— |
—
|
2 |
|
The National Park Service is coordinating with The Boring Company to move forward with an Environmental Assessment (EA) for the BW tunnel project, as discussed in a series of emails among agency officials and project representatives.
|
2018 |
— |
—
|
5 |
|
The National Park Service (NPS) is reviewing documents related to the BW tunnel project and is considering the NPS as the data source, while two title companies are assessing the legal descriptions and alignment provided by Steve Davis.
|
2018 |
— |
—
|
5 |
|
The Department of the Interior's Ethics Office has approved Deputy Secretary Bernhardt's attendance and official remarks at the American Exploration & Production Council's Winter Board Meeting on December 7, 2018, where he will discuss the Department's reorganization.
|
2018 |
— |
—
|
12 |
|
The email correspondence from the U.S. Department of the Interior discusses scheduling a meeting between AWEA representatives and DOI officials regarding wind energy priorities.
|
2018 |
— |
—
|
2 |
|
The email correspondence involves the Department of the Interior discussing a meeting request form related to Deputy Secretary David Bernhardt, with Gareth Rees indicating he can forward it to ethics for scheduling.
|
2018 |
— |
—
|
2 |
|
The email exchange between Colin Hayes and Gareth Rees discusses the potential rescheduling of a wind energy meeting originally set for September 14, 2018, due to uncertainties caused by Hurricane Florence, with a suggestion to consider later dates and logistics for attendees from the American Wind Energy Association (AWEA).
|
2018 |
— |
—
|
2 |
|
The email from Colin Hayes to officials at the U.S. Department of the Interior discusses scheduling a meeting with the American Wind Energy Association (AWEA) to address their priorities related to DOI activities.
|
2018 |
— |
—
|
2 |