Enforcement Actions in New York

EPA enforcement actions in New York (2021–2025)

Era: 2017–2021 2025–present All years
Page 1 of 1 — 56 documents
Summary Year FOIA ID Number Bates / Custodian Pages
The U.S. Environmental Protection Agency conducted an unannounced Resource Conservation and Recovery Act Compliance Evaluation Inspection at Columbia Memorial Hospital on December 19, 2024, to assess the facility's hazardous waste management program and ensure compliance with RCRA regulations. 2025 13
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Alstom Transportation in Plattsburgh, New York, on February 29, 2024, to assess the facility's hazardous waste management program for regulatory compliance. 2024 10
The U.S. Environmental Protection Agency (EPA) conducted an Underground Storage Tank inspection at Conoco/Yonkers Fuel in Yonkers, NY, on June 27, 2024, and provided the inspection report to the facility operator, urging prompt rectification of any identified concerns. 2024 18
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Salerno Packaging Inc. on July 18, 2024, to assess the facility's hazardous waste management program for compliance with regulations. 2024 16
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Weco Manufacturing in Ontario, New York, on September 10-11, 2024, to assess compliance with wastewater discharge regulations. 2024 42
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Macaran Printed Products in Cohoes, New York, on December 18, 2024, to assess the facility's hazardous waste management program for compliance with federal regulations. 2024 7
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System compliance inspection at the HP Hood Lafargeville Plant on April 2-3, 2024, to assess adherence to permit requirements and plan for a permit modification due to changes in wastewater treatment processes. 2024 24
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Medisca Inc. in Plattsburgh, New York, on July 17, 2024, to assess the facility's hazardous waste management program for compliance with federal regulations. 2024 6
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System compliance inspection at Kedem Winery on August 20, 2024, to assess adherence to the requirements of their NPDES permit NY0219011. 2024 28
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Kerry Bio-Science on September 17, 2024, to assess the facility's hazardous waste management program for compliance with federal regulations. 2024 10
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Wood Group Pratt & Whitney Industrial Turbine Services on February 28, 2024, to assess the facility's hazardous waste management program for compliance with federal regulations. 2024 5
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Ox Specialty Papers, LLC in Carthage, New York, on April 4-5, 2024, to assess compliance with federal pretreatment standards and the facility's Industrial User Permit. 2024 44
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Marval Industries, Inc. on July 23-24, 2024, to assess compliance with federal regulations regarding wastewater discharge. 2024 76
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at O-I Glass in Auburn, New York, on August 29-30, 2024, to assess the facility's hazardous waste management program and ensure compliance with the Resource Conservation and Recovery Act regulations. 2024 9
The U.S. Environmental Protection Agency conducted a RCRA Compliance Evaluation Inspection at Golden Artist Colors Inc. on September 18, 2024, to assess the facility's hazardous waste management program and ensure compliance with the Resource Conservation and Recovery Act regulations. 2024 9
The U.S. EPA Region 2 conducted an initial site inspection on January 17, 2023, at the Battaglia Property and eastern corner of Dikeman Firehouse Property in Goshen, NY, to gather factual information under the Clean Water Act Section 404. 2023 27
The U.S. Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the Village of Highland Falls Wastewater Treatment Plant from February 28 to March 1, 2023, to assess compliance with SPDES Permit No. NY0022586. 2023 15
The US Environmental Protection Agency conducted a National Pollution Discharge Elimination System Compliance Sampling Inspection at the Target Hill Water Treatment Plant in West Point, NY, on August 21, 2023, to assess compliance with SPDES permit number NY0023761. 2023 16
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Hyatt Ball Company in Fort Edward, New York, on February 9, 2023, to assess compliance with federal pretreatment requirements and effluent guidelines. 2023 39
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Newburg Egg Processing Corporation on March 15-16, 2023, to assess compliance with pretreatment requirements and sample stormwater outfalls for benchmark pollutants. 2023 20
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the City of Salamanca Wastewater Treatment Plant on June 21-22, 2023, to assess compliance with NPDES Permit NY0020508. 2023 27
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the Village of Liberty Wastewater Treatment Plant in New York on September 6-7, 2023, to assess compliance with their NPDES/SPDES permit. 2023 16
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Agri-Mark in Chateaugay, New York, on September 19-20, 2023, to assess compliance with their Significant Industrial User Discharge Permit and federal pretreatment standards. 2023 21
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Thomas Electronics in Clyde, New York, on September 26, 2023, to assess compliance with federal effluent standards and the facility's Industrial User Permit. 2023 50
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the Village of Woodridge Wastewater Treatment Plant on March 14-15, 2023, to assess compliance with NPDES Permit NY0272817 while the facility awaits permit renewal. 2023 22
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at CROWN Cork & Seal's Nichols Site on April 12-13, 2023, to assess compliance with federal wastewater discharge regulations. 2023 51
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Corning Incorporated's Integrated Die Manufacturing facility in Painted Post, New York, on September 26-27, 2023, to assess compliance with environmental regulations. 2023 52
The U.S. EPA Region 2 conducted an initial site inspection on July 15, 2022, for the Pinebrook Road Sewer Line in Chestnut Ridge, NY, under the Clean Water Act Section 404 to gather factual information regarding compliance. 2022 24
The U.S. EPA Region 2 conducted an initial site inspection on August 26, 2022, at Dick's Concrete in New Hampton, NY, under the Clean Water Act Section 404 to gather factual information for case development. 2022 44
The U.S. EPA Region 2 conducted an initial site inspection on September 9, 2022, at the James Marquis Property in Milton, NY, under the Clean Water Act Section 404 to gather factual information regarding compliance. 2022 20
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at O-AT-KA Milk Products Cooperative, Inc. on April 26-27, 2022, to assess compliance with their Standard Industrial User Permit and federal pretreatment regulations. 2022 69
The U.S. Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection and NPDES Compliance Sampling Inspection at Friesland Campina Ingredients North America, Inc. on June 29-30, 2022, to assess compliance with their Industrial User Agreement and NPDES Permit. 2022 26
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Saputo Dairy Foods USA in Delhi, New York, on June 29-30, 2022, to assess compliance with pretreatment requirements. 2022 18
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Sportsfield Specialties, Inc. on November 15, 2022, to assess compliance with federal pretreatment regulations and their Industrial User Permit. 2022 59
The U.S. Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Standard Printed Circuits, Inc. on February 23, 2022, to assess compliance with federal pretreatment regulations and the company's industrial user permit. 2022 49
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the City of Batavia Water Pollution Control Plant on April 28-29, 2022, to assess compliance with NPDES Permit requirements. 2022 30
The document is an NPDES Compliance Sampling Inspection Report conducted by the US Environmental Protection Agency on June 30, 2022, to assess the compliance of the Delhi Public Owned Treatment Works in New York with its SPDES permit requirements. 2022 20
The U.S. EPA Region 2 conducted an initial site inspection on August 26, 2022, at JuSuDa Farm in Warwick, NY, under the Clean Water Act Section 404 to gather factual information regarding the site's compliance. 2022 64
The U.S. EPA Region 2 conducted an initial site inspection on September 9, 2022, at the SVG Holdings Property in Wallkill, NY, to assess compliance with the Clean Water Act Section 404. 2022 37
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the Rockland County Sewer District #1 Wastewater Treatment Plant on April 6-7, 2021, to assess compliance with NPDES Permit NY0031895. 2021 29
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at Matco Tools in Lakewood, New York, on March 18-19, 2021, to assess compliance with metal finishing discharge regulations. 2021 34
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at the Henkel Corporation's Geneva site on June 8-9, 2021, to assess compliance with the City of Geneva's Industrial Waste Discharge Permit and related federal regulations at the request of the New York State Department of Environmental Conservation. 2021 25
The U.S. Environmental Protection Agency conducted a NPDES Performance Audit Inspection on August 18, 2021, at the Albany County Water Purification District - North WWTP in Menands, New York, to evaluate compliance with SPDES Permit No. NY0026875 and assess the permittee's self-monitoring program. 2021 10
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Compliance Sampling Inspection at the Marsh Creek Wastewater Treatment Plant in Geneva, NY, on June 10-11, 2021, to assess compliance with NPDES Permit NY0027049 at the request of the New York State Department of Environmental Conservation. 2021 25
The United States Environmental Protection Agency conducted a National Pollutant Discharge Elimination System Pretreatment Compliance Sampling Inspection at G.W. Lisk Company in Clifton Springs, New York, on July 22, 2021, to assess compliance with metal finishing regulations. 2021 9
The United States Environmental Protection Agency conducted a Pretreatment Compliance Sampling Inspection at Alta Metal Finishing, Inc. on August 2 and September 18, 2024, to assess compliance with wastewater discharge regulations under 40 CFR Part 403 and the facility's discharge permit. 2002 99
The document details a CWA 404 inspection conducted by the EPA at the Newburg Egg Processing Plant in Woodridge, Sullivan County, NY, on June 22, 2021, focusing on stormwater management and runoff issues. 44
The document details a CWA 404 inspection conducted by the agency on October 5, 2021, at the Cioffi Property in Stony Point, NY, focusing on the placement of a stream into a corrugated plastic pipe and includes photographic documentation of the site. 17
The U.S. Army Corps of Engineers conducted a wetland determination inspection at the Battaglia Properties located at 2 & 6 Dikeman Drive in Goshen, NY, on May 23, 2023, confirming the presence of hydric soil and indicating that the sampled area is within a wetland. 30
The document is an EPA CWA 404 inspection photolog for the Jajoa Holding Corp. property in Kauneonga Lake, NY, conducted on September 12, 2023, detailing wetland determination findings by the U.S. Army Corps of Engineers. 33
The U.S. Army Corps of Engineers conducted a wetland determination inspection at the Tringali Property in Ulster County, NY, on March 26, 2024, confirming the presence of hydric soil and wetland hydrology despite recent disturbances to vegetation and soil. 27
The U.S. Army Corps of Engineers conducted a wetland determination inspection on October 20, 2022, for Lawngevity Landscaping and Garden Gate Nursery in Chester, Orange County, NY, confirming the presence of hydric soil and wetland conditions. 29
The U.S. Army Corps of Engineers conducted a wetland determination for the Wodzinski Property in Minisink, NY, on May 16, 2023, concluding that the sampled area is not within a wetland despite the presence of hydrophytic vegetation and hydric soils. 49
The document details a CWA 404 inspection conducted by the agency on October 5, 2021, at the Chelkas Chassidim Cemetery in New Hempstead, NY, focusing on disturbances such as tree clearing and grading, along with soil profiling and wetland delineation. 23
The document details a CWA 404 inspection conducted by the agency at the Yuknevich Residence in Shawangunk, NY, on October 27, 2021, focusing on the redirection of a stream back into its original channel and the condition of wetland mitigation areas. 19
The document is an EPA CWA 404 inspection photolog detailing wetland determination data for Fair Oaks Road Associates, Inc. in Middletown, NY, conducted by the U.S. Army Corps of Engineers on September 12, 2023, indicating the presence of wetland hydrology and hydric soil. 41